2. Costs related to plant closure

On 13 May 2024, the Board of Directors of Vetropack Holding Ltd decided to close the production site in St-Prex. For 2024, this position includes costs for personnel expenses (CHF 11.8 million), impairments of tangible assets (CHF 4.8 million) and of inventories (CHF 2.4 million), and other operating expenses (CHF 1.3 million), in connection with the closure of the production site in St-Prex.

For 2025, the position includes personnel expenses (CHF 0.5 million) and other operating expenses (CHF 1.6 million) in connection with the closure of the production site in St-Prex.